Photos

Click on a photo album to view full size and manually transition photos.

Latest house photos, April 2021 - close to move in

1/38

Gutter Downspouts, Trenches, Filter, and Pump for Water Catchment; Cement Pads & Partial Driveway (Mar. 2021 - April)

1/25

Garage Door, External Paint, Appliances, Fixtures, Bamboo Floor, Solar, Gutters, Stair Railings, Glass Shower Enclosures (Feb. - Mar. 2021)

1/47

Insulation, Tile, Paint, Cabinets, Gravel, Granite

(Dec. 2020 - Feb. 2021

1/54

Drone Photos (Nov. 2020)

1/6

Bamboo Assembly. (Sept. 2020).  Kit shipped from Vietnam factory. View bamboo house plans.

1/73

Foundation and Framing (June - Sept. 2020)

1/37

Ground Breaking & Excavation (May-June 2020)

1/24

Working on the Property (April 2020)

It has been 6 months of living on the Big Island of Hawaii.  We have been busy lopping, chopping, chipping and sawing down dead trees and making pathways through the property.

1/32

The Move & First Month in Paradise (Nov. - Dec. 2019)

1/27

25th Anniversary Hawaii Wedding Vow Renewal (2017)

1/20

Bull Dozing (2015)

Property before Bull Dozing
Property before Bull Dozing

Future Driveway Location
Future Driveway Location

Ken & Laura
Ken & Laura

Property before Bull Dozing
Property before Bull Dozing

1/20